Page 82 - 41st Summit Brochure
P. 82

COVID-19  certificates  and  to  monitor  the  training  for  operators,  policy  makers  and
                          wellness of driver and travellers, as well as to  regulators were provided on the CTMS. Specific
                          monitor movements for the purpose of contact  training was provided on the use of the Operator
                          tracing if required.                    Web Application by a number of operators in
                                                                  Botswana, Namibia and Zambia. The CTMS
                          Covid-19 Pandemic and the Development of  pilot will run from April to September 2021 and
                          the Corridor Trip Monitoring System     an  evaluation  report  shall  be  prepared  for
                          At the onset of the COVID-19 pandemic in  validation by Member States.
                          Africa  during  April  2020,  the  EU  invited           Upon the successful completion of the pilot
                          COVID-19  mitigation  proposals  and  in  implementation, it is envisaged that the CTMS
                          response TTTFP submitted a technical and  will  be  deployed  along  the  other  Tripartite
                          financial  proposal  for  the  development,  corridors, starting with the ones in respect of
                          commissioning  and  maintenance  of  a  which  Member/Partner  States  have  already
                          surveillance  and  monitoring  system  for  expressed a desire to implement.
                          drivers, vehicles and loads engaged in regional
                          trade  and  transportation.  EU  awarded  an  The Lobito Corridor Trade Facilitation
                          amount  of  EUR  3.6  million  for  the  Project
                          development,    implementation,   and   The Lobito Corridor Trade Facilitation Project
                          maintenance of the Corridor Trip Monitoring  (LCTFP) funded by the Africa Development
                          System (CTMS).                          Bank  (AfDB),  is  implementing  the
                                 Due    to   the   urgency   of   harmonization  of  measures,  laws  and
                          implementation  of  COVID-19  remedial  regulation in the Road, Railway, Trade and
                          measures to alleviate the disruptions caused to  Marine sectors in SADC within the framework
                          cross-border road transport, and queues of  of the RISDP, RIDMP, SISR and PTCM. The
                          several  kilometres  that  regularly  formed  at  Lobito Corridor is coordinated by the SADC
       80                 border posts, approval was given on 11 May  Secretariat on behalf on the corridor Member

                          2020  for  the  development  of  the  CTMS  to  States  in  development  of  Corridor
                          proceed,  with  a  view  to  have  the  CTMS  Management Institution. The programme is
                          available  for  implementation  within  the  being implemented in five stages:
                          shortest possible timeframes.  Consequently,  •  Stage 1 Establishment of the Corridor
                          the  first  Release  of  the  software  became  Governance Instruments;
                          available on 22 June 2020 and a further two  •  Stage 2 Harmonization of Measures,
                          releases have since been completed.          Laws and Regulations;
                                 The  SADC  Secretariat  mobilized   •  Stage 3 Domestication of Measures,
                          addition funding for CTMS equipment to be    Laws and Regulation by Member
                          used by Officials of Member States participating  States;
                          in the CTMS pilot from the Government of   •  Stage 4 Identification of Member
                          Germany  through  GIZ.    Botswana,  Malawi,  States Project priority List and
                          Mozambique,  Namibia,  Zambia,  Zimbabwe     Corridor Master Plan;
                          and DRC are participating in the CTMS pilot  •  Stage 5 Resource Mobilization for
                          being implemented on sections of the Trans   Infrastructure Development.
                                          Kalahari, Walvis Bay/         The Corridor can serve as a model for
                                          Ndola/  Lubumbashi  and  accelerating integration by providing support
                                          North-South Corridors.   to Member States in adopting the regulations
                                               User  manuals  and  at  national  level.  This  will  be  done  in
                                          training      material  collaboration  with  TTTFP,  Association  of
                                          supporting  CTMS  were  Southern  African  National  Road  Agencies
                                          developed at the same time  (ASANRA),  Southern  African  Railways
                                          and made available to the  Association  (SARA),  and  cross-SADC
                                          operators. Workshops and  Directorate stakeholders.
   77   78   79   80   81   82   83   84   85   86   87